1915 Çanakkale Bridge

1915 Çanakkale Bridge
Dardanelles Bridge


1915 Çanakkale Köprüsü
Çanakkale Boğaz Köprüsü
Çanakkale bridge, nearing completion, March 2022
Coordinates40°20′24″N 26°38′10″E / 40.34000°N 26.63611°E / 40.34000; 26.63611
Carries6 lanes of O-6
Maintenance walkways on each side
CrossesDardanelles
LocaleÇanakkale Province, Turkey
Official name1915 Çanakkale Köprüsü
Website1915canakkale.com/en-us
Characteristics
DesignSuspension
Total length4,608 m (15,118 ft)
Width45.06 m (148 ft)
Height334 m (1,096 ft)
Longest span2,023 m (6,637 ft)
Clearance below70 m (230 ft)
History
DesignerCOWI A/S and PEC (Pyunghwa Engineering Consultants)
Constructed byDaelim, Limak, SK, Yapı Merkezi
Construction startMarch 2017
Construction end26 February 2022
Opened18 March 2022; 20 months ago (2022-03-18)
Statistics
Toll280
Location
Map

The 1915 Çanakkale Bridge (Turkish: 1915 Çanakkale Köprüsü) is a road suspension bridge in the province of Çanakkale in northwestern Turkey. Situated just south of the coastal towns of Lapseki and Gelibolu, the bridge spans the Dardanelles, about 10 km (6.2 mi) south of the Sea of Marmara. The bridge was officially opened by President Recep Tayyip Erdoğan on 18 March 2022 after roughly five years of construction. The year "1915" in the official Turkish name honours an important Ottoman naval victory against the navies of the United Kingdom and France during World War I.

The bridge is the longest suspension bridge in the world—with a main span of 2,023 m (2.023 km; 1.257 mi), the bridge surpasses the Akashi Kaikyo Bridge (1998) in Japan by 32 m (105 ft). It is the centrepiece of the planned 321-kilometre long (199 mi) US$2.8 billion Kınalı-Balıkesir Motorway, which will connect the O-3 and O-7 motorways in East Thrace to the O-5 motorway in Anatolia.

The bridge is the first fixed crossing over the Dardanelles and the sixth one across the Turkish Straits, after three bridges over the Bosphorus and two tunnels under it.

Design and cost

The bridge's tender project was designed by Tekfen Construction and Installation and detailed designed by COWI A/S and PEC (Pyunghwa Engineering Consultants in South Korea, for cable design and approach bridge design packages only). Arup and Aas-Jakobsen participated in the project as Independent Design Verifier (IDV). The Administrator consultants are Tekfen and T-ingénierie.

The total length of the bridge is 3,563 m (11,690 ft) and together with the approach viaducts the length reaches 4,608 m (15,118 ft), which surpasses the total length of the Osman Gazi Bridge and its approach viaducts by 527 m (1,729 ft), to become the longest bridge of any type in Turkey.

The height of the bridge's two towers is 334 m (1,096 ft), making it the tallest bridge in Turkey, surpassing Yavuz Sultan Selim Bridge, and the third tallest structure in the country. Internationally, the bridge is the second tallest bridge in the world, surpassing the Pingtang Bridge in China. The deck of the bridge is 72.8 m (239 ft) high and 45.06 m (147.8 ft) wide, with a maximum thickness of 3.5 m (11 ft). The deck carries six lanes of motorway (three in each direction), together with a walkway on each side for maintenance.

According to President Erdoğan, the bridge cost 2.5 billion euros (2.7 billion US dollars) to build, but would save €415 million ($458 million) per year from a reduction of fuel consumption and carbon emissions.

History

Proposals for a bridge spanning the Dardanelles Strait have existed since the 1990s. A bridge was proposed again in 2012, and in 2014, it was placed in the Turkish government's future transportation projects list. In September 2016, the government officially launched the bridge building project. Bids for the contract to construct the bridge were made in 2017. The contract was awarded to a consortium containing Turkish companies Limak Holding and Yapı Merkezi, alongside South Korean companies DL Holdings and SK Ecoplant.

Construction began in March 2017. The bridge was initially scheduled for completion in September 2023, and later brought forward to March 2022. On 16 May 2020, the second tower was completed, on the Gallipoli side (European coast). By 13 November 2021 all block decks were installed. The toll bridge opened for traffic on 18 March 2022, with a toll price of 200 lira (€6.78).

A Chinese consul general Zhang Meifang uploaded a video to social media on 13 Feb 2023 that inaccurately claimed the bridge in Turkey withstood the recent devastating earthquake thanks to Chinese technology. Zhang wrote, "The bridge built by China in Turkey’s withstood the earthquake #ChinaTech." She also falsely claimed that "a subsidiary of Shudao Group is the sole participant in the construction." The bridge was also unlikely to be in any danger from the devastating magnitude 7.8 earthquake that struck Turkey's southeastern provinces on 6 Feb 2023, as it is located approximately 950 kilometers (590 miles) northwest from Kahramanmaras, the city closest to the quake's epicenter.

Symbolism

Some symbolic figures are associated with the bridge:

  • the number 1915 in the name,
  • the height of intersection point of main cable (318 m),
  • and the opening date (18 March),

are all related to the date of the Ottoman naval victory, on 18 March 1915, during the naval operations in the Gallipoli campaign. Meanwhile, the length of the bridge's main span (2,023 metres) refers to the centennial of the Turkish Republic (1923–2023).

Gallery

Comparison of notable bridges

Comparison of the side elevations of the 1915 Çanakkale Bridge and some notable bridges at the same scale (click for interactive version)

See also


This page was last updated at 2023-11-28 07:46 UTC. Update now. View original page.