Motorways in Albania

The motorways in Albania are identified by green signs.
The sign in the beginning of the motorway.

The motorways in Albania (Albanian: Autostrada or Autoudhë) are the controlled-access highway system in Albania predominantly under the supervision of the Ministry of Infrastructure and Energy. The motorways are characterised as roads with at least two lanes in each driving direction including an emergency lane and a maximum allowed speed limit of not less than 110 kilometres per hour (68 mph).

The longest motorway in Albania constitute the A1 motorway which connects Durrës in Albania to Pristina in Kosovo. There is also a motorway from Fier to Vlorë, the A2 motorway, as well as the A3 motorway from Tirana to Elbasan. The majority of the motorways are still under construction or in various stages of development such as the bypasses of Fier, and Tirana and the planned sections between Thumana and Kashar, and between Milot and Balldren. In some ways, Albanian motorway road signs bears some similarity to those of Italy.

Motorways

Completed

Motorway County Length Cities Description
Durrës, Tirana, Lezhë, Kukës 114 km (71 mi) Durrës, Laç, Lezhë, Rrëshen, Kukës The A1 (Albanian: Autostrada A1) is mostly a four traffic lane toll motorway spanning 114 km (71 mi). The motorway connects the Albanian Adriatic Sea Coast at Durrës in the southwest to the Albanian Alps at Morinë in the northeast. As of 2020, the motorway is being upgraded to full motorway standard. It is part of the European route E851, Pan-European Corridor X and the proposed Adriatic–Ionian motorway.
Fier, Vlorë 46.5 km (28.9 mi) Fier, Vlorë The A2 (Albanian: Autostrada A2) is a four traffic lane motorway spanning 46.5 km (28.9 mi). The motorway connects Fier in the north from the Bypass of Fier to Vlorë in the south to the Bypass of Vlorë. The Bypass of Fier was completed in June 2020. It will be a segment of the proposed Adriatic–Ionian motorway.
Tirana, Elbasan 31.1 km (19.3 mi) Tirana, Elbasan The A3 (Albanian: Autostrada A3) is a four traffic lane motorway spanning 31.1 km (19.3 mi). The motorway connects Tirana in the northwest to Elbasan in the southeast. It is part of the Pan-European Corridor VIII.

Future projects

Motorway County Length Section Description Scheduled completion
Lezhe, Durrës, Tirana, Fier 115 km (71 mi) Milot – Fier Linking A1 with central and southern Albania, the section between Milot and Fier is part of the planned Adriatic Ionian motorway. The construction of the section between Thumana and Kashar began in 2019, but works have ceased due to reallocation of funds. 2024

Lezhe 17 km (11 mi) Milot – Balldren The section between Milot and Balldren is part of Tirana-Shkodër corridor linking A1 at the Milot interchange with northern Albanian Adriatic Sea resorts. The project includes the construction of a tunnel bypassing Lezhe and is part of the planned Adriatic-Ionian Motorway.
Elbasan, Berat, Gjirokastër 79 km (49 mi) BeratTepelenë The construction of the section between Berat and Tepelenë is under planning process. The Bypass of Tepelenë was completed in July 2020.

See also


This page was last updated at 2023-04-04 20:57 UTC. Update now. View original page.

All our content comes from Wikipedia and under the Creative Commons Attribution-ShareAlike License.


Top

If mathematical, chemical, physical and other formulas are not displayed correctly on this page, please useFirefox or Safari